• Home
  • News
  • Downloads
  • Reserved Area
  • English
    • Français
    • Deutsch
    • Italiano
    • Español
logo
logo
  • About us
    • About us
    • Vision & Mission
    • Certifications
    • Environmental sustainability
    • CRI-MAN worldwide
  • Livestock
    • Pumps
    • Mixers
    • Slalom systems
    • Separators
    • HBC Biocells
  • Biogas
    • Pumps
    • Mixers
    • Separators
    • HBC Biocells
  • Industry
    • Pumps
    • Mixers
    • Separators
  • Case histories
    • Livestock
    • Biogas
    • Industry
  • Service
  • Contacts
  • Home
  • News
  • Downloads
  • Reserved Area
  • English
    • Français
    • Deutsch
    • Italiano
    • Español

Case History

  1. Home
  2. SHIRVAN Dairy Farm with 2.400 Cows in Azerbaigian

SHIRVAN Dairy Farm with 2.400 Cows in Azerbaigian


We are excited to announce the start of our latest project: the installation of a manure management system in a dairy farm housing 2.400 cows in Azerbaijan.
The project includes:
• The washing of channels with PTS 22 kW pump, TBM11 kW mixer and multiple 3-way valves system
• The transfer from the multiple collection pit to the separation tank with PTS 18.5 kW pump
• The flushing washing of the rotary 100 stalls waiting area
• The separation using 2 x SM 260 PRO separators
• The management of the separated liquid differentiated into 5 different lagoons


SectorLivestockLocationAzerbaigianPlantPTS 22, PTS 18.5, TBM 11, SM 260 PROYear2024TypeLivestock plant

OTHER PLANTS

SM300 – Installation of separators in an OFMSW plant

CRI-MAN is pleased to announce that a plant for processing the organic fraction…

Installation of a livestock slurry plant for a dairy cattle farm in Piacenza

CRI-MAN is pleased to announce that a plant for treating the slurry produced in…

Installation of a complete system for 850 cows in Romania

CRI-MAN is pleased to announce that a complete plant for processing livestock…

Installation of a biogas plant for a dairy cattle farm in Piacenza

CRI-MAN is pleased to announce that a plant for treating the slurry produced in…

Installation of a livestock slurry and biogas plant in Caserta

CRI-MAN is pleased to announce that a plant for treating the slurry produced in…

Installation of a biogas plant in Piacenza

CRI-MAN is pleased to announce that a biogas plant for treating the slurry…

Contacts for further details

+39 0522 732204info@cri-man.com
+39 0522 732204info@cri-man.com

CRI-MAN s.p.a.
a socio unico

Via del Lavoro 9/A
42015 Correggio (RE) Italy

See where we are on Maps
Livestock
  • Introduction
  • Pumps
  • Mixers
  • Slalom systems
  • Separators
  • HBC Biocells
Biogas
  • Introduction
  • Pumps
  • Mixers
  • Separators
  • HBC Biocells
Industry
  • Introduction
  • Pumps
  • Mixers
  • Separators
Menu
  • Case histories
  • Home
  • About us
  • Service
  • News
  • Downloads
  • Contacts

CRI-MAN S.p.A. a socio unico reserves the right to make changes to improve its own products anytime and without any notice.
© CRI-MAN S.p.A. a socio unico | All rights reserved | RE 235624 – VAT No: 01923430357 | Privacy Policy | Cookie Policy | Web Agency Campbell Adv.
This site is protected by Google reCAPTCHA v3, Google’s Privacy Policy and Terms of Service.